Migrating everything at once concentrates the risk on a single moment, with no way back if something breaks.
Lightly documented legacy, fuzzy dependencies, and often the people who built it are no longer around.
Data centre contract ending, price hikes, end-of-life hardware: you have to move, fast, without rushing.
A complete inventory of the existing setup.
The right choice per workload.
A defined rollback at every step.
Traffic redirected with no downtime.
5 to 10 days to map the existing setup and quantify the starting point, read-only.
A concrete action plan, at a fixed price, with gains and risks set down in black and white.
We execute with your engineers, in days, not quarters. On a project or ongoing basis.
A quantified, actionable action plan.
Scope and price announced before we start.
Audit is free if it surfaces no savings.
We co-build, you stay in control.