// SITUATION Β· MIGRATION

Leaving your data centre: migrate before the deadline.

End of contract, price increase, end-of-life hardware. The deadline is coming and you need to migrate cleanly.

Plan my exitBook a call
// THE SITUATION

Leave the data centre in time.

01

The symptom

A hard deadline (end of lease, hardware renewal, price hike) forces you to move, fast, without rushing everything.

02

The source of risk

Poorly documented legacy, fuzzy dependencies, critical data, and often the people who built it are no longer around.

03

What happens if you do nothing

You're stuck with the renewal (expensive), or you migrate in a panic at the last minute.

04

How we fix it

We map the existing setup, sequence the exit in phases and keep to the deadline's schedule.

// THE SIGNS

Recognise yourself?

A contractual or hardware deadline is approaching
Your current infra is poorly documented
You're torn between renewing and migrating
You're afraid of breaking something by moving
// WHAT WE PUT IN PLACE

What you get.

A complete inventory of your existing setup
A migration strategy (the 6 Rs) per workload
A schedule aligned with your deadline
A phased plan with rollback
// HOW WE START

A starting point, a deliverable, execution.

01

Audit / Blueprint

5 to 10 days to map the existing setup and quantify the starting point, read-only.

02

The deliverable

A concrete action plan, at a fixed price, with gains and risks set down in black and white.

03

Execution

We execute with your engineers, in days, not quarters. On a project or ongoing basis.

// WHY STRALYA

A deliverable, a fixed price, clear commitments.

A deliverable, not a slide

A quantified, actionable action plan.

A fixed price, upfront

Scope and price announced before we start.

We commit to the result

Audit is free if it surfaces no savings.

With your engineers

We co-build, you stay in control.

// FAQ

Frequently asked questions.

No, we start precisely by mapping it out. The inventory is part of the work.
// WHAT'S NEXT
β†’ AWS cloud migration→↑ All situationsβ†’

Leave your data centre in time.

We map and plan the migration.

AWS TEARDOWN Β· FREE

Get the AWS Teardown: where your bill really goes.

The guide listing the 12 cost areas that leak the most at scale-ups, and how to plug them. Free, by email, no obligation.