// MIGRATION Β· METHOD

Phased migration: a rollback at every step.

Phased migration breaks the move to the cloud into reversible steps. At each stage, you can validate, or roll back, without ever risking the entire service.

Plan my phasesBook a call
// THE PROBLEM

The big bang concentrates all the risk on a single moment.

01

The all-at-once risk

Migrating everything at once means betting that nothing breaks on go-live day. If it breaks, there's no easy way back.

02

The breakdown

We migrate in coherent batches, each tested and cut over independently. The at-risk scope stays small at every step.

03

The rollback

Every phase has a defined point of return. If something goes wrong, we revert to the previous stable state without undoing everything.

// WHAT WE DO

How a phase plays out.

Prepare

Replicate and test off-load.

Cut over

Redirect traffic gradually.

Verify

Validate metrics and functionality.

Secure

Rollback ready if needed.

// WHAT'S INCLUDED

The scope, no surprises.

A breakdown into coherent phases
A rollback point per step
A gradual traffic cutover
Validation at each stage
A realistic schedule
Joint tracking with your teams
// HOW WE START

A starting point, a deliverable, execution.

01

Audit / scoping

5 to 10 days to map the existing setup and quantify the starting point, read-only.

02

The deliverable

A concrete action plan, at a fixed price, with gains and risks set down in black and white.

03

Execution

We execute with your engineers, in days, not quarters.

// FAQ

Frequently asked questions.

That's the goal of the method: every cutover is gradual and reversible.
// WHAT'S NEXT
→ Migration strategy→→ Legacy migration→

Migrate step by step, never blind.

A guaranteed rollback at every phase.

AWS TEARDOWN Β· FREE

Get the AWS Teardown: where your bill really goes.

The guide listing the 12 cost areas that leak the most at scale-ups, and how to plug them. Free, by email, no obligation.