Stralya

Services

DevOps consulting services

CI/CD automation, infrastructure as code, observability and release engineering. Shorter lead times, fewer failed deployments, and releases that stop being a source of stress.

DORA metrics from day oneTooling without dogmaReply within 24h

In short

Stralya's DevOps consulting practice covers CI/CD pipelines, release engineering, infrastructure as code, observability and orchestration. Engineers, not slide-writers, build the pipelines with your team so you ship faster, deploy with fewer failures and keep everything they built after they leave.

2/wk → 15/day

Deployment frequency

A fintech scale-up, in six weeks, with an on-call rotation that stopped being a punishment.

4 weeks

Focused CI/CD project

Value delivered in four weeks. A full transformation covers IaC, observability and orchestration in 3 to 6 months.

30 days

Post-handover support

Documentation, internal training and DORA metrics confirming that the improvement holds.

When to call us

Signs you need a DevOps consultant

  1. 01

    Releases are a source of stress

    Deployments are rare, long and need a war room, so teams batch changes and the risk of each release keeps growing.

  2. 02

    Environments drift and nobody knows why

    Manual changes and snowflake servers make every incident harder to reproduce and every audit longer.

  3. 03

    Alerts are noise and outages are surprises

    Without SLOs tied to user impact, teams learn about problems from their customers instead of their dashboards.

  4. 04

    Pipelines are owned by one person

    A black-box pipeline is a risk. We build them with your team so the knowledge stays inside the company.

How it works

Structured process value from week one

  1. PHASE 01

    Discovery & assessment

    Pipeline diagnostics, engineer interviews, tooling audit and baseline DORA metrics. The output: a written maturity assessment with prioritized recommendations, so you know what to fix first and why.

  2. PHASE 02

    Pilot & quick wins

    One or two high-impact fixes in parallel with the assessment, like parallelizing a slow test suite or repairing a flaky deployment script. Value proven early, momentum built with the team.

  3. PHASE 03

    Implementation

    Sprints alongside your engineers, pairing as the default. No black-box pipelines: we build them with your team so they own the result, documented and shipped through the pipelines we improve.

  4. PHASE 04

    Handover & enablement

    Documentation, internal training and a 30-day support window. Post-engagement DORA metrics confirm the improvement holds, with a roadmap your team continues independently.

Why us

Engineers not slide-writers

Tooling without dogma

What your team can maintain

Production experience across Jenkins, GitLab CI, GitHub Actions, ArgoCD, Terraform, Pulumi and Kubernetes. We recommend what fits your context, not what is fashionable.

Measurable outcomes

DORA metrics from day one

Deployment frequency, lead time, change failure rate and time to recovery, tracked throughout. Impact visible to leadership, not just felt by engineers.

Culture, not just tooling

Practices that stick

Trunk-based development, feature flags, blameless postmortems. Your engineers leave with better pipelines and a stronger delivery culture that outlasts the Terraform modules.

Pricing

How DevOps consulting engagements are priced

Scoped against your goals, not a fixed template. Durations below are typical, not promised.

FormatTypical scopeDurationPrice
Focused CI/CD projectPipeline rebuild with security gates, parallel tests and DORA metrics4 weeksFixed quote after diagnosis
Typical engagementAssessment, pilot and quick wins, implementation, handover6 to 12 weeksFixed quote after diagnosis
Full DevOps transformationCI/CD, infrastructure as code, observability and orchestration3 to 6 monthsFixed quote after diagnosis
Enablement supportDocumentation, training and a support window after handover30 daysFixed quote after diagnosis

What changes the price: number of services and environments, current tooling, team size and how much pairing you want during implementation.

Client outcomes

Measured results from real engagements

2/wk → 15/day

Deployments · Fintech scale-up

From holding their breath twice a week to deploying fifteen times a day in six weeks, with an on-call rotation that stopped being a punishment.

1 year

Migration pain avoided · SaaS

Reliable IaC built on their existing VM stack, with orchestration recommended only once traffic justified it. Honesty that saved a year of migration.

6 months

Culture that stuck · Industrial IoT

Blameless postmortems, feature-flag discipline and trunk-based flow still in place long after the consultants left. The tooling was the wedge, the culture the result.

Reviewed by

Julien Mauclair

Co-founder, technical delivery · Stralya

Last updated:

FAQ

DevOps consulting FAQ

Straight answers to the questions we hear before every DevOps engagement.

How long does a typical engagement last?

Most run 6 to 12 weeks. A focused CI/CD project delivers value in 4 weeks; a full transformation covering IaC, observability and orchestration runs 3 to 6 months. Scoped against your goals, not a fixed template.

Do you impose your own stack?

No. We have production experience with Jenkins, GitLab CI, GitHub Actions, ArgoCD, Terraform, Pulumi and Kubernetes, and we recommend what your team can maintain. If your current tooling works, we improve it rather than replace it to follow a trend.

Can you help if we are not on Kubernetes?

Yes. Kubernetes is not a requirement and not always the right answer. We work with virtual machines, managed container services and simpler schedulers, and recommend orchestration only once your scale and traffic justify the added complexity.

How do you measure success?

With the four DORA metrics: deployment frequency, lead time for changes, change failure rate and time to recovery. We set a baseline during the assessment, track them throughout the engagement and measure them again after handover, so the impact is visible to leadership.

Will our team maintain the pipelines after you leave?

Yes, that is the point. We pair with your engineers by default, document every pipeline and module, and run internal training before handover. A 30-day support window follows, and post-engagement DORA metrics confirm the improvement holds without us.

Start your DevOps transformation today

Reply within 24h · First call, no commitment