Stralya

Web development

Legacy web migration consulting

Old framework to modern stack, monolith to modular: migrations split into phases, each with its own release, its own checks and a tested way back. Customers keep using the product throughout.

Strangler figFeature flagsPhased cutover

In short

Legacy web migration is the replacement of an aging web application, or of its framework, data layer or structure, by a modern equivalent without losing the business rules and data it holds. Stralya migrates in small phases that run alongside the old system, each released on its own and each with a rehearsed rollback.

2 to 4 weeks

Typical assessment

Inventory, business rules, dependencies and a phased migration plan before any code moves.

3 to 12 months

Typical migration

Delivered phase by phase, with the product live and shipping between releases.

95%

Client retention

Clients who keep working with Stralya after a first engagement.

What is legacy web migration?

Legacy web migration moves a web application off foundations that no longer serve it: an unsupported framework, a monolith that every team must touch, a data layer that resists change or hosting that cannot scale. The result keeps what the business depends on, the rules, the data, the URLs and the integrations, on top of a structure your team can evolve.

The hardest part is rarely the new code. It is everything the old system does that nobody wrote down: the edge case added for one customer years ago, the nightly job that quietly fixes bad data, the partner that still calls a forgotten endpoint. A migration succeeds when those behaviors are found before the switch, not after.

The work belongs to our web development consulting practice. Typical scopes include moving an AngularJS or jQuery frontend to a current framework, splitting a monolith into modules, upgrading a backend that is several major versions behind, or replacing a homegrown platform with a supported one. When servers or data centers move too, our cloud consultants join the plan.

Signs you need a legacy web migration

Legacy is not about age. A five-year-old application can be healthy and a two-year-old one can already be a liability. These signals tell us the cost of staying has overtaken the cost of moving.

  • The framework or runtime is out of support

    Security patches have stopped or will stop soon, and every audit raises the same finding with a growing sense of urgency.

  • Hiring for the stack has become hard

    Few developers want to work on the technology, and the people who know it are close to leaving or already overloaded.

  • Small features need large changes

    Business logic is tangled with the user interface and the database, so a minor change touches dozens of files and needs a full regression test.

  • Integrations depend on outdated protocols

    Partners, payment providers or identity systems are moving on, and the old application cannot follow without major rework.

None of these forces a full rewrite. They do mean the current structure needs a plan, because waiting tends to turn a series of manageable phases into one rushed project with a hard deadline.

What our migration assessment covers

The assessment turns an application that lives in people’s memories into a written map. Dependencies get particular attention, because they decide the order of the phases; our guide on managing application dependencies during a migration explains why blockers cascade when they are found late.

  • Feature and business rule inventory

    Every screen, job, endpoint and rule the old system runs, including the undocumented ones found in logs and code paths.

  • Dependency and integration map

    Databases, partners, internal services and scheduled tasks, with who calls what and how often.

  • Target stack and structure

    The framework, modules and data model the application will move to, chosen against your team skills and roadmap.

  • Phase plan with rollback per phase

    The migration split into releasable slices, each with entry criteria, validation checks and a tested return path.

  • Data migration and URL strategy

    How records move and stay consistent, and how existing links, redirects and search visibility are preserved.

The assessment is useful on its own. Some teams run the migration themselves with the plan in hand; others ask us to lead the first phases and hand over once the pattern is proven on production traffic.

Planning a migration?

A migration assessment takes 2 to 4 weeks and ends with a phase plan, a rollback for each phase and a target structure.

Book a free discovery call

How we migrate: four phases

These four phases describe the whole engagement, from the first inventory to the day the old servers are switched off. Inside the third one, the application itself moves in many smaller slices, each released and validated before the next begins.

PHASE 01

Map

Features, rules, dependencies and data inventoried and verified.

PHASE 02

Plan

Target structure, slices, rollback paths and validation criteria.

PHASE 03

Move

Slices released behind routing or flags, old system still live.

PHASE 04

Retire

Old code, data and infrastructure removed once traffic is gone.

Each slice runs next to the old code before it takes real traffic. A routing layer or feature flags send a small share of users to the new path, results are compared, and traffic grows only when the checks pass. Validating in a parallel environment first is covered in our guide on production and staging parallelization before switching over.

Strangler, extraction or rewrite: which approach?

The migration approach is chosen per part of the application, not once for the whole system. The table compares the options we weigh during the assessment, with the conditions under which each one makes sense.

ApproachHow it worksWhen it fitsRollback
Strangler figNew code takes over routes one by oneLarge application that must stay liveRoute traffic back to the old path
Module extractionDomains pulled out of the monolith behind interfacesMonolith with identifiable business domainsSwitch the interface back to the old module
In-place upgradeFramework or runtime raised version by versionStructure is sound, only the platform is outdatedRedeploy the previous version
Full rewriteNew application built, then switched in one cutoverSmall system or no salvageable structureHardest: requires parallel running and data sync

We default to the incremental options because each step is small enough to undo. A full rewrite is recommended only when the old structure has nothing worth keeping, and even then we look for ways to release it in parts. If the backend design itself needs rethinking, our backend development work defines the target before code moves.

Risks and rollback in web migrations

Web migrations fail for a short list of reasons, and all of them can be planned for. Each risk below has an owner, a check and a trigger for rolling back.

  • Lost business rules

    Behaviors nobody documented disappear in the new code. We capture them from logs and code paths, and compare old and new outputs on real requests.

  • Data drift between old and new systems

    Two systems writing the same records diverge quickly. One system owns each record at any time, and reconciliation checks run until the old one is retired.

  • Broken links and lost search visibility

    Changed URLs break bookmarks, partner links and rankings. Every old URL is mapped to its new home with permanent redirects tested before release.

  • A migration that never finishes

    Half-migrated systems double the maintenance load. Each phase has a retirement step, and old code is deleted as soon as traffic leaves it.

The switch for each slice follows a written runbook with go and no-go checks. Our guides on data and application state synchronization at cutover and on preparing a cutover with no service interruption detail what those runbooks contain.

Legacy web migration pricing

Every engagement starts with a diagnosis and ends with a fixed quote. Durations are typical, not promised, and depend heavily on the size of the old system.

FormatDurationPrice
Migration assessment2 to 4 weeksFixed quote after diagnosis
Phased migration3 to 12 monthsFixed quote after the assessment
Post-migration supportMonthlyMonthly fee quoted at handover

What changes the price: size of the legacy codebase, volume and quality of the data to move, number of integrations and how much of the work your team takes on.

The quote covers senior consultants only, a defined scope and the deliverables of each phase, from the inventory to the retirement of the old code. Hosting for running both systems in parallel, and any new licences, are paid to their providers separately.

Legacy web migration FAQ

Do we have to freeze features during the migration?

No. Phases are small and released alongside normal product work. New features are built on the new structure where it exists, and on the old one only when the area has not moved yet.

Is a full rewrite ever the right choice?

Sometimes, for small systems or code with no reusable structure. For most business applications, an incremental migration delivers value sooner and keeps every step reversible, which a single cutover cannot do.

How do you avoid losing business rules?

By treating the old system as the specification. We inventory rules from code and logs, then compare old and new outputs on real requests before each slice takes full traffic.

Will our search rankings suffer?

Not if URLs are handled properly. Every existing URL is mapped to its new address with a permanent redirect, metadata is carried over, and the redirects are tested before each release.

Can our developers keep working on the old code?

Yes. Your team keeps maintaining the parts that have not moved yet. We agree which areas are frozen for each slice, usually for a few days around its switch, so work does not collide.

What happens to the old system at the end?

It is retired in steps: traffic removed, data archived according to your retention rules, code deleted and infrastructure shut down. Retirement is planned from the start, not left as an optional cleanup.

Reviewed by

Julien Mauclair

Co-founder, technical delivery · Stralya

Last updated:

A legacy app to modernize? Let’s talk